Origo I

Origo I is a part of the Origo portfolio with the Origo Energia off-taker as a sole partner. The first 18 MW are divided into 6 different sites underpinning our commitment to providing sustainable and clean energy solutions.
Origo I
18
Origo I
2023
Origo Energia, 20 years
Solar, ground mounted
6,5k
315k
1k
NIC (Nordic Impact Cooperation, Valora Invest
The Origo I project has 2 sites in Uberlandia, a municipality in the state of Minas Gerais, southeastern Brazil. It is the second largest municipality in the state of Minas Gerais after the state capital Belo Horizonte. The city is located in the Brazilian Highlands 2,802 feet (854 m) above sea level. It is an important logistic hub between Sao Paulo and Brasilia.

Uberlandia
As part of the Origo I pipeline, Norsk Renewables has developed a pipeline of 2 PV plants, each 3 MW, Uberlandia in the state of Minas Gerais. The total project consists of 6 PV plants of 2.5 MWas/3 MWp each. The projects have passed a strict legal, environmental, and social impact assessment following the IFC PS.
MW:
6
Location:
Uberlandia
PPA partner:
Origo Energia
COD:
2023/24
Sustainability:
ESIA followed the IFC PS
LTI:
0
In the Origo I portfolio, Norsk Renewables has developed a pipeline of 12 MW consisting of 4 PV plants in Sao Gotardo, also a part of the state of Minas Gerais. The projects have passed a strict legal, environmental, and social impact assessment following the IFC PS. The PV plants reached COD in Q4 23/Q1 24.
Sao Gotardo I
MW:
15
Location:
Uberlandia
PPA partner:
Origo Energia
COD:
2023/24
Sustainability:
ESIA followed the IFC PS
LTI:
0


Get in touch